Installation of an elevator with silencer & design of a silencer removal system for its maintenance

Our customer, the world leader in rock wool insulation, has contacted us for the installation of a silencer and the design of a removal system for their maintenance.
The existing elevator was pre-cut upstream to minimize the downtime of the plant. The team was responsible for lowering the existing lift to the ground and then mounting the new lift. The silencers were mounted using the system designed for maintenance.

Despite the unforeseen events on site, our team was able to overcome them in order to meet the customer’s requirements. We also thank our partner Aphone +