Our renovation of the tubing of an incineration plant in the Paris region has been completed. We were entrusted with the replacement of 3 SVR ducts with stainless steel ducts 904L. The lifting operations of each 100-high tubing were carried out without stopping production within the plant. Ferbeck was responsible for reprocessing the old tubing in SVR.Despite civil engineering difficulties followed by the period COVID, all the work ended with the complete satisfaction of the main contractor and the main contractor.